| Module 1 | The Foundation |
|---|---|
| Unit 1 | Looking At the Build Site |
| Unit 2 | Laying the First Block |
| Unit 3 | Lining Things Up |
| Unit 4 | Laying the Third Block and Checking Square. |
| Unit 5 | Last block and Next Steps |
| Unit 6 | Making our 16" on Center Marks |
| Unit 7 | Nailing the Joists Together |
| Unit 8 | Finishing the Floor |
| Module 2 | The Back Wall |
| Unit 1 | Lets Frame The Wall |
| Unit 2 | Cutting the Topper |
| Unit 3 | Raising Back Wall |
| Module 3 | The Door |
| Unit 1 | Building The Door Part 1 |
| Unit 2 | Building The Door Part 2 |
| Unit 3 | Building The Door Part 3 |
| Module 4 | Frame The Front Wall |
| Unit 1 | Planning Out The Front Wall |
| Unit 2 | Marking the Front Wall Plates |
| Unit 3 | Frame Up The Front Wall |
| Unit 4 | Sheet Up The Front Wall |
| Unit 5 | Sheet Up Front Wall Pt 2 |
| Unit 6 | Sheet Up Front Wall Pt 3 |
| Unit 7 | Cut Topper Front Wall |
| Module 5 | Peak Sides |
| Unit 1 | Peak Side 1 |
Powered By WP Courseware